The Boys Division is getting a facelift! We received special funding to replace the landscaping in the front of the Chandler Blvd. Campus. They are installing the state-of-the-art drip irrigation system today. The job should be completed within two weeks.
hey! those trees held a lot of memories, like the time I hid in them during a staff meeting and then banged on the window and ran away before Rabbi Striks could catch.